We have recently completed a project for a client in Wellingore, Lincolnshire. The project consisted of the removal of turf in preparation of a new purpose built base including sub base material, dry mix sand and cement base with a truncated square 4 meter flag stone finish. Then the installation of a Log Cabin Summerhouse to be used as an exercise room.
Below are some images from start to finish of the project.
Looking to carry out a similar project? Call or Email me for a chat or a quote
Handy Andy Ruskington 07504 50 50 89